Install the two/three lower screws and make sure to tighten all screws. Place the enclosure’s upper keyholes over the two/three upper screws. Drill the lower holes and install the two/three fasteners. Mark the position of the lower two/three holes. Place the enclosure’s upper keyholes over the two/three upper screws, level and secure. Install two/three upper fasteners and screws in the wall with the screw heads protruding. Mark and predrill holes in the wall to line up with the top two/three keyholes in the enclosure.Wiring methods shall be in accordance with the National Electrical Code/NFPA 70/ANSI, and with all local codes and authorities having jurisdiction. Installation Instructions for Trove1, Trove2, Trove3 Trove3 enclosure accommodates up to four (4) 12VDC/12AH batteries.Trove2 enclosure accommodates up to two (2) 12VDC/12AH batteries.Trove1 enclosure accommodates up to two (2) 12VDC/7AH batteries.9, 11 for the list of compatible sub-assemblies. See TV3 Sub-Assembly Position Charts on Pgs. Includes: lock nuts and mounting hardware.Includes: two (2) tamper switches, cam lock, lock nuts and mounting hardware.16 Gauge enclosure with ample knockouts for convenient access.Trove3 enclosure with TV3 Altronix/VertX® backplane.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |